This page organizes project decisions. It is not a design, code determination or installation instruction for a particular room.
Keep one current selection sheet
List the exact fixtures and appliances, including model information and manufacturer installation documents. Record whether each choice is final or still provisional. A later substitution can affect mounting, connections, clearances and the work schedule, even if it looks similar from the front.
Have the relevant installers review the selection before ordering or rough-in. Identify who handles incompatible products, returns and missing parts. A delivered item should not force an unreviewed alteration simply because the return window is inconvenient.
Coordinate the open-wall stage
Ask the provider what must be accessible for the planned work and inspections. The finish trade should know when that access can be closed. A drawing or verbal plan is not a substitute for the applicable inspection or approval process.
Use the complete property address to confirm the governing authority and project requirements. The permit guide helps define who applies, schedules inspections and retains final records. Keep plumbing, electrical and other building responsibilities distinct even if one contractor coordinates them.
Plan temporary household use
Ask which fixtures will be unavailable during each stage and how the provider's current sequence accommodates essential needs. Avoid assuming that a nearby bathroom or sink can be used while shared connections are open. Follow the actual work plan and safety instructions.
For the kitchen, coordinate appliances and cabinet access. For the bathroom, settle privacy, finish protection and any household access needs. These decisions should appear before removal begins, not during a disrupted morning routine.
Put the final check on the schedule
Name who checks connections after all equipment and finishes are in their final positions. Keep installation documents, approved changes, inspection status and follow-up responsibilities together. Several trades can each finish their own task while leaving a gap at the handoff. A clear closeout owner helps ensure that the completed room has a coherent record of what was done and checked.